Heating upgrades
New radiators, rerouted pipework, cylinder replacement or removal, and changes to the system type.
Gas Safe registered, no. 640594. Check the register (opens in a new tab)
What's included
- New or replacement radiators, valves and towel rails
- Rerouting pipework, including through floors and ceilings
- Replacing or removing a hot water cylinder
- Changing the system type, for example from a system boiler to a combi
- Flushing and refilling the system afterwards
Most upgrades take one to three days, depending on how much pipework moves. The quote gives the expected time.


